{"id":75691,"date":"2025-11-06T12:23:59","date_gmt":"2025-11-06T17:23:59","guid":{"rendered":"https:\/\/www.mdaturbines.com\/?p=75691"},"modified":"2025-11-06T12:23:59","modified_gmt":"2025-11-06T17:23:59","slug":"strategic-parts-inventory-planning","status":"publish","type":"post","link":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/","title":{"rendered":"Strategic Parts Inventory Planning &#8211; Staying Ahead of Outage Constraints"},"content":{"rendered":"<h2><span style=\"color: #003366;\"><b><strong>The Challenge: Supply Chain Constraints &amp; Tightening Outage Windows<\/strong><\/b><\/span><\/h2>\n<p>In today\u2019s energy landscape, regional capacity shortfalls are creating more restrictive outage durations. At the same time, supply chain constraints continue to challenge the availability of critical components. Lastly, manufacturing and repair shop capacity is nearing full utilization due to high demand. For power generators, this means that every minute of downtime matters and every part must be ready when needed.<\/p>\n<p>That\u2019s why MD&amp;A is helping customers take a proactive approach to parts inventory planning.<\/p>\n<h2><span style=\"color: #003366;\"><b><strong>The Solution: Increase Inventory Ahead of Planned Outages<\/strong><\/b><\/span><\/h2>\n<p>By building up inventory of critical spares before outages begin, this enables faster turnaround, reduced risk, and keeping your outage on track.<\/p>\n<p>Here\u2019s a breakdown of the key components we\u2019re helping customers stock in advance:<\/p>\n<h2><span style=\"color: #003366;\"><b>1. &#8216;Drop-in&#8217; valve assemblies<\/b><\/span><\/h2>\n<p><span style=\"font-size: 16px;\">Our <a href=\"https:\/\/www.mdaturbines.com\/parts\/steam-turbine\/combined-cycle-valve-drop-in\/\">Drop-in Valve Solution<\/a> combines the valve wear parts into a pre-assembled set and allows you to replace them more quickly. This moves the detailed shop inspection and repair work for individual valve parts off the outage critical path. The Drop-in set that is removed is inspected\/repaired\/replaced at the shop and prepared for the next outage.<\/span><\/p>\n<h2><span style=\"color: #003366;\"><b>2. D-11 Upgraded valve components<\/b><\/span><\/h2>\n<p>Such as our MD&amp;A developed MSV Nickel Cladded Stem and Hardened Seat Upgrade can reduce erosion rates &amp; prevent steam leakage. With proven results reducing stem erosion by 80%, these components offer direct interchangeability with existing parts and enable extended maintenance intervals.<\/p>\n<h2><span style=\"color: #003366;\"><b>3. Stellite-lined Bushing upgrades<\/b><\/span><\/h2>\n<p>The Stellite-lined bushing upgrades help reduce oxide formation\/ stem binding, minimize wear while maintaining stem-to-bushing clearances, and support extended maintenance intervals.<\/p>\n<h2><span style=\"color: #003366;\"><b>4. Patented Triplet Type MSV upgrade<\/b><\/span><\/h2>\n<p>The Patented <a href=\"https:\/\/www.mdaturbines.com\/resources\/triplet-main-stop-valve-upgrade\/\">Triplet Type MSV upgrade<\/a> provides an effective counter-measure to solid particle erosion experienced on conventional valve designs.\u00a0\u00a0One advantage of the Triplet Type Bypass Main Stop Valve includes significantly reduced erosion on the valve stem and skirt.\u00a0\u00a0Consequently, valve maintenance is reduced.\u00a0 This design can be applied in both sub and super-critical applications.<\/p>\n<h2><span style=\"color: #003366;\"><b>5. Long Blades<\/b><\/span><\/h2>\n<p>Our <a href=\"https:\/\/www.mdaturbines.com\/parts\/steam-turbine\/mhps-long-blades\/\">Continuous Cover Blades<\/a> (CCB) are constructed using a mono-block blade structure that leaves fewer locations for corrosive deposits and is less susceptible to stress corrosion cracking. Also ask about our 34.5\u201d LSB direct replacement option.<\/p>\n<h2><span style=\"color: #003366;\"><b>6. Packing and Spill Strips\u00a0\u00a0<\/b><\/span><\/h2>\n<p><a href=\"https:\/\/www.mdaturbines.com\/parts\/steam-turbine\/conventional-packing-spill-strips\/\">Packing and Spill Strips<\/a> can be manufactured in advance of your outage to reduce the critical path. We stock of a large variety of raw materials, and sizes, to serve our customer base. Our extensive technical library provides us with the ability to manufacture to OEM specifications and tolerances or make experience driven recommendations.<\/p>\n<h2><span style=\"color: #003366;\"><b>7. Stator Rewind and Punching Kits\u00a0<\/b><\/span><\/h2>\n<p>7A6 &amp; 7FH2 generator <a href=\"https:\/\/www.mdaturbines.com\/parts\/spare-assets\/#rewind-kit\">stator rewind and punching kits<\/a>, along with <a href=\"https:\/\/www.mdaturbines.com\/parts\/spare-assets\/#generator-field\">generator exchange fields<\/a> \u2013 both new &amp; refurbished fields. These in-stock components ready to go will shorten your outage duration and keep your equipment running.<\/p>\n<h2><span style=\"color: #003366;\"><b>8. Turning Gear Components<\/b><\/span><\/h2>\n<p>Turning gear components often have long lead times, so it\u2019s best to order them well in advance to ensure they\u2019re on hand and ready when needed, rather than waiting during your outage.<\/p>\n<h2><span style=\"color: #003366;\"><b>9. Flow Parts\u00a0<\/b><\/span><\/h2>\n<p>Also stock all your Flow Parts:\u00a0Valve components, Shell &amp; casing hardware\u00a0(including Inco\/Refractalloy\u00a0components), Snout rings and bell seals, and new bearings and oil deflectors.<\/p>\n<h2><span style=\"color: #003366;\"><b>The Impact: <strong>Shorter Durations, Longer Intervals, Less Risk<\/strong><\/b><\/span><\/h2>\n<p>Strategic parts inventory planning isn\u2019t just about having parts on hand. It\u2019s about reducing schedule risks, extending outage intervals, and addressing known reliability<strong> issues<\/strong> before they become problems.<\/p>\n<p>MD&amp;A\u2019s approach ensures that your team is prepared, your equipment is supported, and your outage strategy is optimized.<\/p>\n<h2><span style=\"color: #003366;\"><b><strong> Ready to Plan Smarter?<\/strong><\/b><\/span><\/h2>\n<p>Let\u2019s talk about how MD&amp;A can help you build a smarter inventory strategy for your next outage. Contact us today or explore our full range of outage support services.<\/p>\n<p>Call us at\u00a0<a href=\"tel:+15183993616\">518-885-3199<\/a> or reach out directly via our\u00a0<a href=\"https:\/\/www.mdaturbines.com\/contact\/\">contact form<\/a>\u00a0to schedule a consultation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Challenge: Supply Chain Constraints &amp; Tightening Outage Windows In today\u2019s energy landscape, regional capacity shortfalls are creating more restrictive outage durations. At the same&#8230;<\/p>\n","protected":false},"author":22,"featured_media":75698,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[3,211],"tags":[],"class_list":["post-75691","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mda-insight","category-parts"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Strategic Parts Inventory Planning<\/title>\n<meta name=\"description\" content=\"Take a proactive approach to parts inventory planning with MD&amp;A. Build up critical spares early to reduce outage risk and shorten downtime.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Strategic Parts Inventory Planning\" \/>\n<meta property=\"og:description\" content=\"Take a proactive approach to parts inventory planning with MD&amp;A. Build up critical spares early to reduce outage risk and shorten downtime.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"MDA Turbines\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/mdaturbines\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-06T17:23:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2025\/10\/TPL-6.png\" \/>\n\t<meta property=\"og:image:width\" content=\"289\" \/>\n\t<meta property=\"og:image:height\" content=\"289\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Bryanna Agan\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bryanna Agan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/\"},\"author\":{\"name\":\"Bryanna Agan\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/person\\\/2d258e5b51c90ef13658a9939cbc7515\"},\"headline\":\"Strategic Parts Inventory Planning &#8211; Staying Ahead of Outage Constraints\",\"datePublished\":\"2025-11-06T17:23:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/\"},\"wordCount\":648,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/TPL-6.png\",\"articleSection\":[\"MD&amp;A Insight\",\"Parts\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/\",\"name\":\"Strategic Parts Inventory Planning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/TPL-6.png\",\"datePublished\":\"2025-11-06T17:23:59+00:00\",\"description\":\"Take a proactive approach to parts inventory planning with MD&A. Build up critical spares early to reduce outage risk and shorten downtime.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/TPL-6.png\",\"contentUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/TPL-6.png\",\"width\":289,\"height\":289,\"caption\":\"Parts inventory planning\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/strategic-parts-inventory-planning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mdaturbines.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Strategic Parts Inventory Planning &#8211; Staying Ahead of Outage Constraints\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#website\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/\",\"name\":\"MD&A Turbines\",\"description\":\"MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US..\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\"},\"alternateName\":\"Mechanical Dynamics & Analysis\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mdaturbines.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\",\"name\":\"Mechanical Dynamics & Analysis\",\"alternateName\":\"MD&A Turbines\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/MDA_logo.gif\",\"contentUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/MDA_logo.gif\",\"width\":1179,\"height\":258,\"caption\":\"Mechanical Dynamics & Analysis\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/mdaturbines\",\"https:\\\/\\\/x.com\\\/mdaturbines\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/person\\\/2d258e5b51c90ef13658a9939cbc7515\",\"name\":\"Bryanna Agan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e06041bbb8d6b951d6f4d1294b5d9cff4aeaba427863cd0e64a0fe9458ada21b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e06041bbb8d6b951d6f4d1294b5d9cff4aeaba427863cd0e64a0fe9458ada21b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e06041bbb8d6b951d6f4d1294b5d9cff4aeaba427863cd0e64a0fe9458ada21b?s=96&d=mm&r=g\",\"caption\":\"Bryanna Agan\"},\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/author\\\/baganmdaturbines-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Strategic Parts Inventory Planning","description":"Take a proactive approach to parts inventory planning with MD&A. Build up critical spares early to reduce outage risk and shorten downtime.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/","og_locale":"en_US","og_type":"article","og_title":"Strategic Parts Inventory Planning","og_description":"Take a proactive approach to parts inventory planning with MD&A. Build up critical spares early to reduce outage risk and shorten downtime.","og_url":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/","og_site_name":"MDA Turbines","article_publisher":"http:\/\/www.facebook.com\/mdaturbines","article_published_time":"2025-11-06T17:23:59+00:00","og_image":[{"width":289,"height":289,"url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2025\/10\/TPL-6.png","type":"image\/png"}],"author":"Bryanna Agan","twitter_misc":{"Written by":"Bryanna Agan","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/#article","isPartOf":{"@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/"},"author":{"name":"Bryanna Agan","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/person\/2d258e5b51c90ef13658a9939cbc7515"},"headline":"Strategic Parts Inventory Planning &#8211; Staying Ahead of Outage Constraints","datePublished":"2025-11-06T17:23:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/"},"wordCount":648,"commentCount":0,"publisher":{"@id":"https:\/\/www.mdaturbines.com\/#organization"},"image":{"@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2025\/10\/TPL-6.png","articleSection":["MD&amp;A Insight","Parts"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/","url":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/","name":"Strategic Parts Inventory Planning","isPartOf":{"@id":"https:\/\/www.mdaturbines.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/#primaryimage"},"image":{"@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2025\/10\/TPL-6.png","datePublished":"2025-11-06T17:23:59+00:00","description":"Take a proactive approach to parts inventory planning with MD&A. Build up critical spares early to reduce outage risk and shorten downtime.","breadcrumb":{"@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/#primaryimage","url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2025\/10\/TPL-6.png","contentUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2025\/10\/TPL-6.png","width":289,"height":289,"caption":"Parts inventory planning"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mdaturbines.com\/resources\/strategic-parts-inventory-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mdaturbines.com\/"},{"@type":"ListItem","position":2,"name":"Strategic Parts Inventory Planning &#8211; Staying Ahead of Outage Constraints"}]},{"@type":"WebSite","@id":"https:\/\/www.mdaturbines.com\/#website","url":"https:\/\/www.mdaturbines.com\/","name":"MD&A Turbines","description":"MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US..","publisher":{"@id":"https:\/\/www.mdaturbines.com\/#organization"},"alternateName":"Mechanical Dynamics & Analysis","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mdaturbines.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mdaturbines.com\/#organization","name":"Mechanical Dynamics & Analysis","alternateName":"MD&A Turbines","url":"https:\/\/www.mdaturbines.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2019\/01\/MDA_logo.gif","contentUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2019\/01\/MDA_logo.gif","width":1179,"height":258,"caption":"Mechanical Dynamics & Analysis"},"image":{"@id":"https:\/\/www.mdaturbines.com\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/mdaturbines","https:\/\/x.com\/mdaturbines"]},{"@type":"Person","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/person\/2d258e5b51c90ef13658a9939cbc7515","name":"Bryanna Agan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e06041bbb8d6b951d6f4d1294b5d9cff4aeaba427863cd0e64a0fe9458ada21b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e06041bbb8d6b951d6f4d1294b5d9cff4aeaba427863cd0e64a0fe9458ada21b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e06041bbb8d6b951d6f4d1294b5d9cff4aeaba427863cd0e64a0fe9458ada21b?s=96&d=mm&r=g","caption":"Bryanna Agan"},"url":"https:\/\/www.mdaturbines.com\/resources\/author\/baganmdaturbines-com\/"}]}},"_links":{"self":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/75691","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/comments?post=75691"}],"version-history":[{"count":25,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/75691\/revisions"}],"predecessor-version":[{"id":75836,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/75691\/revisions\/75836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/media\/75698"}],"wp:attachment":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/media?parent=75691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/categories?post=75691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/tags?post=75691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}