{"id":75519,"date":"2025-10-07T16:02:14","date_gmt":"2025-10-07T20:02:14","guid":{"rendered":"https:\/\/www.mdaturbines.com\/?p=75519"},"modified":"2026-02-20T13:28:05","modified_gmt":"2026-02-20T18:28:05","slug":"is-your-fleet-prepared","status":"publish","type":"post","link":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/","title":{"rendered":"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared?"},"content":{"rendered":"<p>In the early 2000s the US gas turbine market saw a significant boom, often referred to as a \u00abbubble.\u201d GE\u00ae, being a major player in the gas turbine market, experienced a surge in orders and installations of its F-class and E-class turbines, specifically the 7FA and 7EA models.<\/p>\n<p>MD&amp;A specializes in servicing E- and F-class gas turbine rotors.<\/p>\n<p>To provide the best solutions for your gas turbine rotor, MD&amp;A will evaluate your specific needs in addition to assessing rotor inspections.<\/p>\n<p>Learn more from Dave Fernandes, MD&amp;A\u2019s Gas Turbine Program Manager, &amp; Spencer Hamilton, MD&amp;A\u2019s Gas Turbine Services Sales Director in the following Q&amp;A:<\/p>\n<ol>\n<li style=\"list-style-type: none;\">\n<ol>\n<li><strong>In the early 2000s the US gas turbine market saw a significant boom, often referred to as a \u00abbubble.\u201d \u2013 what is the bubble?<\/strong><br \/>\n<blockquote><p>The \u00abbubble\u00bb refers to the surge in new gas turbine\u2013based power plant expansion in the United States. It was driven primarily by shrinking power reserve margins, relatively low natural gas prices, and power market deregulation.<\/p><\/blockquote>\n<\/li>\n<li><strong>What did that mean for GE\u00ae sales &amp; installs at the time?<\/strong><br \/>\n<blockquote><p>GE\u2019s production of gas turbines rose dramatically\u2014from a capacity of about 80 machines per year in 1998, to 180 in 1999, and 240 in 2000. The majority of these sales were the GE 7FA gas turbine.<\/p><\/blockquote>\n<\/li>\n<li><strong>Fast forward, what does that mean for these gas turbines for their remaining life? Why is it important to look at?<\/strong><br \/>\n<blockquote><p>A large percentage of the 7FA installed base came from the 1998\u20132001 bubble. Many of these units are now approaching their rotor end-of-life, as outlined by the OEM: 144,000 fired factored hours (FFH) or 5,000 fired factored starts (FFS).<\/p>\n<p>Operating profiles vary, but some combined cycle units can accumulate more than 7,000 fired factored hours in a single year.<\/p>\n<p>As a result, many bubble-era units\u2014especially base-loaded combined cycle plants\u2014are nearing their end-of-life limits.<\/p><\/blockquote>\n<\/li>\n<li><strong>What role do these aging assets currently play in our overall energy mix, and how critical are they to grid reliability?<\/strong><br \/>\n<blockquote><p>Thanks to their favorable heat rate (efficiency) and lower emissions compared with many other fossil fuel plants, 7FA combined cycle units form one of the backbones of the U.S. power grid. In addition, simple-cycle 7FA and 7EA units play an essential role in supporting peak load demand and grid stability.<\/p><\/blockquote>\n<\/li>\n<li><strong>Are all 7FA rotors the same?<\/strong><br \/>\n<blockquote><p>No. The early 7F models, known as 7F.01 and 7FA.02, have significant design differences compared with later models (7FA.03 and beyond). Most of the turbines installed during the bubble were the 7FA.03, which remains widespread today, along with the 7FA.04. There are no major differences between the 7FA.03 and 7FA.04 rotors. The difference between a 7FA.03 and 7FA.04 gas turbine is associated with the combustion and hot gas path parts.<\/p><\/blockquote>\n<\/li>\n<li><strong>With the high demand for new manufacturing impacting the industry &amp; other items, Why should customers be thinking now about their rotor for next 3-5 years? Why the urgency?\u00a0<\/strong><br \/>\n<blockquote><p>Planning ahead is critical due to supply chain constraints. Forging houses that produce gas turbine components also serve the aerospace and defense industries, all of which are experiencing simultaneous surges in demand. This results in longer and less predictable lead times.<\/p>\n<p>Shop capacity is also strained, with limited space and workforce available to handle the growing number of gas turbines nearing rotor end-of-life. Securing both parts and shop availability early is essential to keeping these valuable assets running.<\/p><\/blockquote>\n<\/li>\n<li><strong>Is there increasing difficulty or expense in sourcing parts and technical expertise for these aging turbine models?\u00a0<\/strong><br \/>\n<blockquote><p>Yes. Supply chain challenges have driven costs higher, while shifting tariff policies add further unpredictability to the price of key components.<\/p>\n<p>In addition, OEM technical expertise often shifts toward supporting newer product lines\u2014particularly as the latest \u201cbubble\u201d of gas turbine development has emerged, with the H-class leading new unit sales.<\/p>\n<p>In contrast, MD&amp;A remains committed to legacy assets, continuing to prioritize support for the 7FA, 7EA, and 7B fleets for years to come.<\/p><\/blockquote>\n<\/li>\n<\/ol>\n<\/li>\n<\/ol>\n<p>With changes in the industry, growth and the bubble, you should be thinking now for next 3-5 years!<\/p>\n<p>A <a href=\"https:\/\/www.mdaturbines.com\/library\/rotor-life-extension\/\">Rotor Life Assessment &amp; Extension service<\/a> can help decide if component repair, replacement, or use is the best option for your gas turbine rotor to meet operational and maintenance forecasts.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/www.mdaturbines.com\/resources\/gas-turbine-rotor-life-extension-video\/\" target=\"_self\" class=\"button\" role=\"button\">Want to learn more? Watch our Video!<span><i class=\"fa-sharp fa-light fa-chevron-right\"><\/i><\/span><\/a><\/p>\n<p style=\"text-align: center;\"><a href=\"https:\/\/content.mdaturbines.com\/sdekx4jshhnnxdzii5wk4u53f\/l\/s8q7pza5gtg9o4zax32j?_gl=1*vrisgw*_gcl_au*MTM4OTI1NTE2OC4xNzUxMzcxNTI4*_ga*MTg3MDk2NjY0Ni4xNzQzNTM2MzQw*_ga_EDY23JZ9KW*czE3NTc3MDE2NTIkbzc2JGcxJHQxNzU3NzAxNzAzJGo5JGwwJGgw\" target=\"_self\" class=\"button\" role=\"button\">Or Secure a spot to our Rotor Life Extension webinar<span><i class=\"fa-sharp fa-light fa-chevron-right\"><\/i><\/span><\/a><\/p>\n<p><img decoding=\"async\" class=\"aligncenter wp-image-71948\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-683x1024.jpg\" alt=\"7FA unstack\" width=\"467\" height=\"700\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-683x1024.jpg 683w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-200x300.jpg 200w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-768x1152.jpg 768w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-1024x1536.jpg 1024w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-1365x2048.jpg 1365w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-107x160.jpg 107w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-60x90.jpg 60w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2023\/10\/7FA-unstack_72-scaled.jpg 1600w\" sizes=\"(max-width: 467px) 100vw, 467px\" \/><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the early 2000s the US gas turbine market saw a significant boom, often referred to as a \u00abbubble.\u201d GE\u00ae, being a major player in&#8230;<\/p>\n","protected":false},"author":2,"featured_media":66621,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[208,3,211],"tags":[319],"class_list":["post-75519","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gas-turbine","category-mda-insight","category-parts","tag-rotor-life-extension"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared? &#8211; MDA Turbines<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared? &#8211; MDA Turbines\" \/>\n<meta property=\"og:description\" content=\"In the early 2000s the US gas turbine market saw a significant boom, often referred to as a \u00abbubble.\u201d GE\u00ae, being a major player in...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/\" \/>\n<meta property=\"og:site_name\" content=\"MDA Turbines\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/mdaturbines\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-07T20:02:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-20T18:28:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2020\/02\/7F-Gas-Turbine-Rotor-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"2400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kelly Plunkett\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kelly Plunkett\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/\"},\"author\":{\"name\":\"Kelly Plunkett\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#\\\/schema\\\/person\\\/ee0e84e14abc852781ad53a495c0533c\"},\"headline\":\"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared?\",\"datePublished\":\"2025-10-07T20:02:14+00:00\",\"dateModified\":\"2026-02-20T18:28:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/\"},\"wordCount\":799,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/7F-Gas-Turbine-Rotor-scaled.jpg\",\"keywords\":[\"Rotor Life Extension\"],\"articleSection\":[\"Gas Turbine\",\"MD&amp;A Insight\",\"Parts\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/\",\"name\":\"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared? &#8211; MDA Turbines\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/7F-Gas-Turbine-Rotor-scaled.jpg\",\"datePublished\":\"2025-10-07T20:02:14+00:00\",\"dateModified\":\"2026-02-20T18:28:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/7F-Gas-Turbine-Rotor-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/7F-Gas-Turbine-Rotor-scaled.jpg\",\"width\":1600,\"height\":2400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/is-your-fleet-prepared\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/\",\"name\":\"MD&A Turbines\",\"description\":\"MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US..\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#organization\"},\"alternateName\":\"Mechanical Dynamics & Analysis\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#organization\",\"name\":\"Mechanical Dynamics & Analysis\",\"alternateName\":\"MD&A Turbines\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/MDA_logo.gif\",\"contentUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/MDA_logo.gif\",\"width\":1179,\"height\":258,\"caption\":\"Mechanical Dynamics & Analysis\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/mdaturbines\",\"https:\\\/\\\/x.com\\\/mdaturbines\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/#\\\/schema\\\/person\\\/ee0e84e14abc852781ad53a495c0533c\",\"name\":\"Kelly Plunkett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d3226d1c3a5895b8e94c98ac7ba906834a28fd94afa044b35e616d164290cffb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d3226d1c3a5895b8e94c98ac7ba906834a28fd94afa044b35e616d164290cffb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d3226d1c3a5895b8e94c98ac7ba906834a28fd94afa044b35e616d164290cffb?s=96&d=mm&r=g\",\"caption\":\"Kelly Plunkett\"},\"sameAs\":[\"https:\\\/\\\/www.mdaturbines.com\"],\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/es\\\/resources\\\/author\\\/kelly-plunkett\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared? &#8211; MDA Turbines","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/","og_locale":"es_ES","og_type":"article","og_title":"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared? &#8211; MDA Turbines","og_description":"In the early 2000s the US gas turbine market saw a significant boom, often referred to as a \u00abbubble.\u201d GE\u00ae, being a major player in...","og_url":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/","og_site_name":"MDA Turbines","article_publisher":"http:\/\/www.facebook.com\/mdaturbines","article_published_time":"2025-10-07T20:02:14+00:00","article_modified_time":"2026-02-20T18:28:05+00:00","og_image":[{"width":1600,"height":2400,"url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2020\/02\/7F-Gas-Turbine-Rotor-scaled.jpg","type":"image\/jpeg"}],"author":"Kelly Plunkett","twitter_misc":{"Escrito por":"Kelly Plunkett","Tiempo de lectura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/#article","isPartOf":{"@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/"},"author":{"name":"Kelly Plunkett","@id":"https:\/\/www.mdaturbines.com\/es\/#\/schema\/person\/ee0e84e14abc852781ad53a495c0533c"},"headline":"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared?","datePublished":"2025-10-07T20:02:14+00:00","dateModified":"2026-02-20T18:28:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/"},"wordCount":799,"commentCount":0,"publisher":{"@id":"https:\/\/www.mdaturbines.com\/es\/#organization"},"image":{"@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2020\/02\/7F-Gas-Turbine-Rotor-scaled.jpg","keywords":["Rotor Life Extension"],"articleSection":["Gas Turbine","MD&amp;A Insight","Parts"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/","url":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/","name":"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared? &#8211; MDA Turbines","isPartOf":{"@id":"https:\/\/www.mdaturbines.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/#primaryimage"},"image":{"@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2020\/02\/7F-Gas-Turbine-Rotor-scaled.jpg","datePublished":"2025-10-07T20:02:14+00:00","dateModified":"2026-02-20T18:28:05+00:00","breadcrumb":{"@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/#primaryimage","url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2020\/02\/7F-Gas-Turbine-Rotor-scaled.jpg","contentUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2020\/02\/7F-Gas-Turbine-Rotor-scaled.jpg","width":1600,"height":2400},{"@type":"BreadcrumbList","@id":"https:\/\/www.mdaturbines.com\/es\/resources\/is-your-fleet-prepared\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mdaturbines.com\/es\/"},{"@type":"ListItem","position":2,"name":"The Clock Is Ticking On 7FA And 7EA Gas Turbine Rotors: Is Your Fleet Prepared?"}]},{"@type":"WebSite","@id":"https:\/\/www.mdaturbines.com\/es\/#website","url":"https:\/\/www.mdaturbines.com\/es\/","name":"MD&A Turbines","description":"MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US..","publisher":{"@id":"https:\/\/www.mdaturbines.com\/es\/#organization"},"alternateName":"Mechanical Dynamics & Analysis","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mdaturbines.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/www.mdaturbines.com\/es\/#organization","name":"Mechanical Dynamics & Analysis","alternateName":"MD&A Turbines","url":"https:\/\/www.mdaturbines.com\/es\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/www.mdaturbines.com\/es\/#\/schema\/logo\/image\/","url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2019\/01\/MDA_logo.gif","contentUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2019\/01\/MDA_logo.gif","width":1179,"height":258,"caption":"Mechanical Dynamics & Analysis"},"image":{"@id":"https:\/\/www.mdaturbines.com\/es\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/mdaturbines","https:\/\/x.com\/mdaturbines"]},{"@type":"Person","@id":"https:\/\/www.mdaturbines.com\/es\/#\/schema\/person\/ee0e84e14abc852781ad53a495c0533c","name":"Kelly Plunkett","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/secure.gravatar.com\/avatar\/d3226d1c3a5895b8e94c98ac7ba906834a28fd94afa044b35e616d164290cffb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d3226d1c3a5895b8e94c98ac7ba906834a28fd94afa044b35e616d164290cffb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d3226d1c3a5895b8e94c98ac7ba906834a28fd94afa044b35e616d164290cffb?s=96&d=mm&r=g","caption":"Kelly Plunkett"},"sameAs":["https:\/\/www.mdaturbines.com"],"url":"https:\/\/www.mdaturbines.com\/es\/resources\/author\/kelly-plunkett\/"}]}},"_links":{"self":[{"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/posts\/75519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/comments?post=75519"}],"version-history":[{"count":20,"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/posts\/75519\/revisions"}],"predecessor-version":[{"id":77864,"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/posts\/75519\/revisions\/77864"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/media\/66621"}],"wp:attachment":[{"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/media?parent=75519"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/categories?post=75519"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mdaturbines.com\/es\/wp-json\/wp\/v2\/tags?post=75519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}