{"id":68583,"date":"2021-10-04T13:00:44","date_gmt":"2021-10-04T17:00:44","guid":{"rendered":"https:\/\/www.mdaturbines.com\/?p=68583"},"modified":"2021-10-04T15:09:18","modified_gmt":"2021-10-04T19:09:18","slug":"comprehensive-industrial-outage","status":"publish","type":"post","link":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/","title":{"rendered":"Comprehensive Industrial Outage"},"content":{"rendered":"<p>Mechanical Dynamics &amp; Analysis (MD&amp;A) experts recently completed a <a href=\"https:\/\/www.mdaturbines.com\/power-generation-service\/\">comprehensive industrial outage<\/a> for a customer. During the planned major outage, the work scope included inspection and repairs of their industrial steam turbine-generator unit.<\/p>\n<p>The major inspection included disassembly, cleaning, inspection, performing recommended actions, and reassembly of the turbine, generator, and auxiliaries. The work scope also provided project planning, technical direction, supervision, tooling, craft labor, subcontract services, generator testing and inspection, high-speed balancing, controls and excitation checkout, as well as, balance engineering support for startup.<\/p>\n<p>MD&amp;A worked 24&#215;7 through the disassembly, cleaning, and inspection phases to identify any needed repairs for discussion and approval from the customer in order to minimize schedule and cost impacts. During the non-destructive testing and inspection phase, 14 partitions required major repairs.<\/p>\n<p>An MD&amp;A Steam Path Specialist arrived on-site to complete a steam path audit including visual inspection of the rotor and buckets. Additionally, recommendations were made to replace the 1st &amp; 2nd stage buckets during this outage and then replace stages 3 through 6 during the next major inspection. Besides the 1st &amp; 2nd stage bucket issues, no other significant findings were noted. The turbine rotor was shipped to MD&amp;A\u2019s Turbine-Generator Repair Facility in St. Louis, MO for bucket replacement (Figure 1) and diaphragm repairs.<\/p>\n<figure id=\"attachment_68590\" aria-describedby=\"caption-attachment-68590\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"size-medium wp-image-68590\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3-300x223.png\" alt=\"Comprehensive Industrial Outage\" width=\"300\" height=\"223\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3-300x223.png 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3-216x160.png 216w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3-90x67.png 90w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3.png 520w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-68590\" class=\"wp-caption-text\">Figure 1. Stage 1 and 2 Buckets Removed and Dovetails Blast Cleaned<\/figcaption><\/figure>\n<p>Part of the planned inspection included the removal of the upper and lower inlet nozzles to inspect the leading edges of the partitions and the shell. Full contact (100%) between the nozzle and shell is required and the onsite team used line boring equipment to skim cut and polish the shell nozzle to realign faces. Additionally, in order to ensure correct axial clearances, the nozzle was built up to offset any material removed during the shell boring and polish operations.<\/p>\n<p>The nozzle segments were sent to our <a href=\"https:\/\/www.mdaturbines.com\/resources\/turbine-generator-repair-facility\/\">Turbine-Generator Repair Facility<\/a> for cleaning, inspection, and minor repairs which included weld buildup of the sealing faces, stress relief heat treating, machining, and final grinding and polishing (Figures 2 and 3). The nozzle segments were then checked with a flat plate in an effort to ensure flatness and minimize the lapping time onsite need to achieve the final desired contact. Typically, priority is placed on the lower half nozzle so that it can be installed and steampath alignment started.<\/p>\n<table class=\" aligncenter\">\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"335\">\n<p><figure id=\"attachment_68592\" aria-describedby=\"caption-attachment-68592\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"size-medium wp-image-68592\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-1-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-1-300x225.jpg 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-1-213x160.jpg 213w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-1-90x68.jpg 90w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-1.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-68592\" class=\"wp-caption-text\">Figure 2. Upper Half Nozzle Partition Erosion<\/figcaption><\/figure><\/td>\n<td width=\"231\">\n<p><figure id=\"attachment_68593\" aria-describedby=\"caption-attachment-68593\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"wp-image-68593 size-medium\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-1-300x225.jpg\" alt=\"Comprehensive Industrial Outage\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-1-300x225.jpg 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-1-213x160.jpg 213w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-1-90x68.jpg 90w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-1.jpg 634w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-68593\" class=\"wp-caption-text\">Figure 3. Machining Lower Half Nozzle<\/figcaption><\/figure><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The valves were also completely disassembled and the onsite team completed dimensional and runout checks on the stems and bushings. Four inner and outer bushings were found to have excessive wear and MD&amp;A Parts provided all necessary replacement components.<\/p>\n<p>Inspection of the generator field journals revealed a moderate amount of imperfections, including radial scoring.\u00a0 MD&amp;A recommended machining both journals, including the hydrogen seal journals, and the collector rings.<\/p>\n<p>The generator field was shipped to our Turbine-Generator Repair Facility for <a href=\"https:\/\/www.mdaturbines.com\/repairs\/generator\/high-speed-balance\/\">High-Speed Balance<\/a> and journal repair &amp; testing (Figure 4). Prior and after repairs and balance, incoming inspections were performed. MD&amp;A Bearings, Seals, &amp; Hydraulics supplied the new bearings and hydrogen seals.<\/p>\n<figure id=\"attachment_68597\" aria-describedby=\"caption-attachment-68597\" style=\"width: 300px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-68597 size-medium\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-1-e1621017168688-300x270.jpg\" alt=\"\" width=\"300\" height=\"270\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-1-e1621017168688-300x270.jpg 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-1-e1621017168688-178x160.jpg 178w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-1-e1621017168688-90x81.jpg 90w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-1-e1621017168688.jpg 432w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-68597\" class=\"wp-caption-text\">Figure 4. Completed tool\/hone\/polish of the turbine end journal including the H2 seal area on the journal<\/figcaption><\/figure>\n<p>After completion of assembly, locks (LOTO) were removed, and MD&amp;A\u2019s team supported system check-outs, and balance engineering support for startup.\u00a0 Our experts submitted a comprehensive report for this comprehensive industrial outage.<\/p>\n<p>MD&amp;A is proud to have served the needs of the customer on inspection, repair, and parts replacement during the planned outage. The project was a total team effort with almost every division of MD&amp;A contributing.<\/p>\n<p>MD&amp;A is a full-service OEM alternative for generator services, parts and repairs with a track record of hundreds of inspections on industrial units performed safely, in a quality manner on schedule and within budget all aimed at helping to ensure reliable unit operations.<\/p>\n<p>Please call MD&amp;A today for any industrial turbine-generator support needs, call us at (518) 399-3616, or use our <a href=\"https:\/\/www.mdaturbines.com\/contact\/\">Contact form<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mechanical Dynamics &amp; Analysis (MD&amp;A) experts recently completed a comprehensive industrial outage for a customer. During the planned major outage, the work scope included inspection&#8230;<\/p>\n","protected":false},"author":13,"featured_media":68590,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[210,209],"tags":[171],"class_list":["post-68583","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-generator","category-steam-turbine","tag-industrial"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Comprehensive Industrial Outage &#8211; MD&amp;A Turbines<\/title>\n<meta name=\"description\" content=\"MD&amp;A experts completed a full comprehensive industrial outage for a customer. The scope included inspection &amp; repairs of the industrial steam turbine-generator.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comprehensive Industrial Outage &#8211; MD&amp;A Turbines\" \/>\n<meta property=\"og:description\" content=\"MD&amp;A experts completed a full comprehensive industrial outage for a customer. The scope included inspection &amp; repairs of the industrial steam turbine-generator.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/\" \/>\n<meta property=\"og:site_name\" content=\"MDA Turbines\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/mdaturbines\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-04T17:00:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-04T19:09:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"520\" \/>\n\t<meta property=\"og:image:height\" content=\"386\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Caitlin Borger\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Caitlin Borger\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/\"},\"author\":{\"name\":\"Caitlin Borger\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/person\\\/fdbd01ed3b81195a72d31a7c9d59d29e\"},\"headline\":\"Comprehensive Industrial Outage\",\"datePublished\":\"2021-10-04T17:00:44+00:00\",\"dateModified\":\"2021-10-04T19:09:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/\"},\"wordCount\":701,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/1-3.png\",\"keywords\":[\"industrial\"],\"articleSection\":[\"Generator\",\"Steam Turbine\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/\",\"name\":\"Comprehensive Industrial Outage &#8211; MD&A Turbines\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/1-3.png\",\"datePublished\":\"2021-10-04T17:00:44+00:00\",\"dateModified\":\"2021-10-04T19:09:18+00:00\",\"description\":\"MD&A experts completed a full comprehensive industrial outage for a customer. The scope included inspection & repairs of the industrial steam turbine-generator.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/1-3.png\",\"contentUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/1-3.png\",\"width\":520,\"height\":386,\"caption\":\"Figure 1. Stage 1 and 2 Buckets Removed and Dovetails Blast Cleaned at St Louis Repair Facility\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/comprehensive-industrial-outage\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mdaturbines.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Comprehensive Industrial Outage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#website\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/\",\"name\":\"MD&A Turbines\",\"description\":\"MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US..\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\"},\"alternateName\":\"Mechanical Dynamics & Analysis\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mdaturbines.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\",\"name\":\"Mechanical Dynamics & Analysis\",\"alternateName\":\"MD&A Turbines\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/MDA_logo.gif\",\"contentUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/MDA_logo.gif\",\"width\":1179,\"height\":258,\"caption\":\"Mechanical Dynamics & Analysis\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/mdaturbines\",\"https:\\\/\\\/x.com\\\/mdaturbines\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/person\\\/fdbd01ed3b81195a72d31a7c9d59d29e\",\"name\":\"Caitlin Borger\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g\",\"caption\":\"Caitlin Borger\"},\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/author\\\/caitlin-borger\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Comprehensive Industrial Outage &#8211; MD&A Turbines","description":"MD&A experts completed a full comprehensive industrial outage for a customer. The scope included inspection & repairs of the industrial steam turbine-generator.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/","og_locale":"en_US","og_type":"article","og_title":"Comprehensive Industrial Outage &#8211; MD&A Turbines","og_description":"MD&A experts completed a full comprehensive industrial outage for a customer. The scope included inspection & repairs of the industrial steam turbine-generator.","og_url":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/","og_site_name":"MDA Turbines","article_publisher":"http:\/\/www.facebook.com\/mdaturbines","article_published_time":"2021-10-04T17:00:44+00:00","article_modified_time":"2021-10-04T19:09:18+00:00","og_image":[{"width":520,"height":386,"url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3.png","type":"image\/png"}],"author":"Caitlin Borger","twitter_misc":{"Written by":"Caitlin Borger","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/#article","isPartOf":{"@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/"},"author":{"name":"Caitlin Borger","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/person\/fdbd01ed3b81195a72d31a7c9d59d29e"},"headline":"Comprehensive Industrial Outage","datePublished":"2021-10-04T17:00:44+00:00","dateModified":"2021-10-04T19:09:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/"},"wordCount":701,"commentCount":0,"publisher":{"@id":"https:\/\/www.mdaturbines.com\/#organization"},"image":{"@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3.png","keywords":["industrial"],"articleSection":["Generator","Steam Turbine"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/","url":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/","name":"Comprehensive Industrial Outage &#8211; MD&A Turbines","isPartOf":{"@id":"https:\/\/www.mdaturbines.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/#primaryimage"},"image":{"@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3.png","datePublished":"2021-10-04T17:00:44+00:00","dateModified":"2021-10-04T19:09:18+00:00","description":"MD&A experts completed a full comprehensive industrial outage for a customer. The scope included inspection & repairs of the industrial steam turbine-generator.","breadcrumb":{"@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/#primaryimage","url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3.png","contentUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-3.png","width":520,"height":386,"caption":"Figure 1. Stage 1 and 2 Buckets Removed and Dovetails Blast Cleaned at St Louis Repair Facility"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mdaturbines.com\/resources\/comprehensive-industrial-outage\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mdaturbines.com\/"},{"@type":"ListItem","position":2,"name":"Comprehensive Industrial Outage"}]},{"@type":"WebSite","@id":"https:\/\/www.mdaturbines.com\/#website","url":"https:\/\/www.mdaturbines.com\/","name":"MD&A Turbines","description":"MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US..","publisher":{"@id":"https:\/\/www.mdaturbines.com\/#organization"},"alternateName":"Mechanical Dynamics & Analysis","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mdaturbines.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mdaturbines.com\/#organization","name":"Mechanical Dynamics & Analysis","alternateName":"MD&A Turbines","url":"https:\/\/www.mdaturbines.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2019\/01\/MDA_logo.gif","contentUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2019\/01\/MDA_logo.gif","width":1179,"height":258,"caption":"Mechanical Dynamics & Analysis"},"image":{"@id":"https:\/\/www.mdaturbines.com\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/mdaturbines","https:\/\/x.com\/mdaturbines"]},{"@type":"Person","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/person\/fdbd01ed3b81195a72d31a7c9d59d29e","name":"Caitlin Borger","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g","caption":"Caitlin Borger"},"url":"https:\/\/www.mdaturbines.com\/resources\/author\/caitlin-borger\/"}]}},"_links":{"self":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/68583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/comments?post=68583"}],"version-history":[{"count":5,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/68583\/revisions"}],"predecessor-version":[{"id":69199,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/68583\/revisions\/69199"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/media\/68590"}],"wp:attachment":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/media?parent=68583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/categories?post=68583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/tags?post=68583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}