{"id":68469,"date":"2021-05-07T11:07:57","date_gmt":"2021-05-07T15:07:57","guid":{"rendered":"https:\/\/www.mdaturbines.com\/?p=68469"},"modified":"2022-05-12T12:25:38","modified_gmt":"2022-05-12T16:25:38","slug":"rapid-steam-turbine-replacement","status":"publish","type":"post","link":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/","title":{"rendered":"Rapid Steam Turbine Replacement"},"content":{"rendered":"<p>Mechanical Dynamics &amp; Analysis (MD&amp;A) completed a comprehensive and rapid steam turbine replacement\u00a0project in record time after the unit experienced a catastrophic failure event, requiring the replacement of the entire steam turbine and auxiliaries.<\/p>\n<p><strong>THE CHALLENGE:<\/strong>\u00a0 \u00a0The subject power plant is an important electrical generating facility in the country it is located within. \u00a0Returning the unit to service in the shortest possible time was critical for the turbine owner to provide its customers with a reliable supply of electricity. \u00a0A typical replacement period for a steam turbine of this design is approximately two (2) years. \u00a0Having the steam turbine offline for that long would have a severe impact and as such, MD&amp;A was called upon to develop an alternative plan to bring the replacement steam turbine online sooner.\u00a0 In addition to the time challenge, there were additional logistical constraints associated with transporting, installing, and repairing large power generation equipment within the subject country.<\/p>\n<p><strong>MD&amp;A\u2019s SCOPE:<\/strong>\u00a0 MD&amp;A was awarded turnkey scope of supply and installation of the steam turbine and auxiliaries. MD&amp;A\u2019s scope included replacing the steam turbine and installing a new control system, as well as a comprehensive rebuild of all steam turbine valves and actuators and installing a new hydraulic power unit.\u00a0 MD&amp;A also provided <a href=\"https:\/\/www.mdaturbines.com\/services\/steam-turbine\/technical-direction\/\">turnkey installation<\/a>, start-up support, and all <a href=\"https:\/\/www.mdaturbines.com\/services\/steam-turbine\/outage-planning\/\">project management<\/a>.<\/p>\n<p><strong>THE SOLUTION:<\/strong> \u00a0MD&amp;A in conjunction with its parent company, Mitsubishi Power, developed a customized plan to complete manufacturing and installation within one (1) year of the project start date.\u00a0 The key elements of this successful plan included reducing manufacturing lead time, coordinating equipment shipping, utilizing MD&amp;A\u2019s extensive in-house capabilities, and overall extensive project management and planning.<\/p>\n<p>Manufacturing lead time was significantly reduced through Mitsubishi Power working closely with their suppliers for rotor forgings and shell castings. \u00a0Mitsubishi Power also expedited manufacturing activities within their factory as well.<\/p>\n<p>Shipping logistics were streamlined with over 300 tons of equipment flown from the factory via charter aircraft in five (5) carefully coordinated flights.<\/p>\n<p>By utilizing MD&amp;A\u2019s extensive in-house capabilities, the MD&amp;A Project Team was able to maintain control of the schedule more effectively and shorten the timeline. MD&amp;A\u2019s three (3) major divisions; <a href=\"https:\/\/www.mdaturbines.com\/services\/steam-turbine\/\">MD&amp;A Services<\/a>, <a href=\"https:\/\/www.mdaturbines.com\/repairs\/steam-turbine\/\">MD&amp;A Repairs<\/a>, and <a href=\"https:\/\/www.mdaturbines.com\/parts\/steam-turbine\/\">MD&amp;A Parts<\/a> supported this project.<\/p>\n<p>For example, critical internal parts for the four (4) steam turbine main and reheat valves were machined at <a href=\"https:\/\/www.mdaturbines.com\/repairs\/steam-turbine\/machining-services\/\">MD&amp;A\u2019s Valve Machining Shop<\/a>.\u00a0 These parts were then fitted and assembled in <a href=\"https:\/\/www.mdaturbines.com\/repairs\/steam-turbine\/high-pressure-valve-repair\/\">MD&amp;A\u2019s Valve Repair Shop<\/a> (Figure 1). The actuators for these valves were repaired, rebuilt, and tested at <a href=\"https:\/\/www.mdaturbines.com\/repairs\/steam-turbine\/turbine-valve-actuators\/\">MD&amp;A Bearings, Seals &amp; Hydraulics Repair facility <\/a>(Figure 2). The new control system was developed and installed by <a href=\"https:\/\/www.mdaturbines.com\/services\/gas-turbine\/control-excitation-field-engineering\/\">MD&amp;A\u2019s Control Systems<\/a>. MD&amp;A also drew upon their internal expertise and deployed MD&amp;A <a href=\"https:\/\/www.mdaturbines.com\/services\/steam-turbine\/turbine-engineering\/\">turbine specialty engineers<\/a> and technicians to the site in support of such activities as technical direction, supervision, <a href=\"https:\/\/www.mdaturbines.com\/services\/steam-turbine\/topless-alignment\/\">turbine alignment<\/a>, valve casing repair, valve re-assembly, turbine seal fitment, controls, turbine commissioning, and startup (Figures 3 and 4).<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"335\">\n<p><figure id=\"attachment_68470\" aria-describedby=\"caption-attachment-68470\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"wp-image-68470 size-medium\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-300x225.jpg\" alt=\"Figure 1. Replacement Reheat Stop Valve Shown Alongside Existing Stop Valves\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-300x225.jpg 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-213x160.jpg 213w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1-90x68.jpg 90w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/1.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-68470\" class=\"wp-caption-text\">Figure 1. Replacement Reheat Stop Valve Shown Alongside Existing Stop Valves<\/figcaption><\/figure><\/td>\n<td width=\"231\">\n<p><figure id=\"attachment_68471\" aria-describedby=\"caption-attachment-68471\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-medium wp-image-68471\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-300x225.jpg\" alt=\"Figure 2. Refurbished Actuator\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-300x225.jpg 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-1024x768.jpg 1024w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-768x576.jpg 768w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-1536x1152.jpg 1536w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-213x160.jpg 213w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2-90x68.jpg 90w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/2.jpg 1600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-68471\" class=\"wp-caption-text\">Figure 2. Refurbished Actuator<\/figcaption><\/figure><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table>\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"335\">\n<p><figure id=\"attachment_68472\" aria-describedby=\"caption-attachment-68472\" style=\"width: 321px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\" wp-image-68472\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-300x169.jpg\" alt=\"Figure 3. MD&amp;A Performing Rapid Steam Turbine Installation at Site \" width=\"321\" height=\"181\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-300x169.jpg 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-1024x578.jpg 1024w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-768x434.jpg 768w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-1536x867.jpg 1536w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-2048x1156.jpg 2048w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-283x160.jpg 283w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/3-90x51.jpg 90w\" sizes=\"(max-width: 321px) 100vw, 321px\" \/><figcaption id=\"caption-attachment-68472\" class=\"wp-caption-text\">Figure 3. MD&amp;A Performing Steam Turbine Installation at Site<\/figcaption><\/figure><\/td>\n<td width=\"231\">\n<p><figure id=\"attachment_68473\" aria-describedby=\"caption-attachment-68473\" style=\"width: 299px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\" wp-image-68473\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-300x181.jpg\" alt=\"Figure 4. MD&amp;A Performing Rapid Steam Turbine Installation at Site \" width=\"299\" height=\"180\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-300x181.jpg 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-1024x617.jpg 1024w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-768x462.jpg 768w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-1536x925.jpg 1536w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-2048x1233.jpg 2048w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-266x160.jpg 266w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/4-90x54.jpg 90w\" sizes=\"(max-width: 299px) 100vw, 299px\" \/><figcaption id=\"caption-attachment-68473\" class=\"wp-caption-text\">Figure 4. MD&amp;A Performing Steam Turbine Installation at Site<\/figcaption><\/figure><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Lastly, MD&amp;A\u2019s developed a staggered \u201cJust-In-Time\u201d plan that integrated delivery of the components with the sequence of the replacement turbine buildout. This approach coordinated and optimized the manufacturing, delivery, and site installation activities to further shorten the critical path schedule. \u00a0For example, the Intermediate\/Low-Pressure Rotor Assembly arrived at the airport in the early morning (Figure 5) and later that same day, it was installed in the lower half of the turbine shell at the plant (Figure 6).<\/p>\n<table>\n<tbody>\n<tr>\n<td style=\"text-align: center;\" width=\"335\">\n<p><figure id=\"attachment_68474\" aria-describedby=\"caption-attachment-68474\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-medium wp-image-68474\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/5-300x209.png\" alt=\"Figure 5. IP\/LP Rotor Assembly Package Unloaded at Airport\" width=\"300\" height=\"209\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/5-300x209.png 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/5-230x160.png 230w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/5-90x63.png 90w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/5.png 481w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-68474\" class=\"wp-caption-text\">Figure 5. IP\/LP Rotor Assembly Package Unloaded at Airport<\/figcaption><\/figure><\/td>\n<td width=\"231\">\n<p><figure id=\"attachment_68475\" aria-describedby=\"caption-attachment-68475\" style=\"width: 300px\" class=\"wp-caption alignnone\"><img decoding=\"async\" class=\"size-medium wp-image-68475\" src=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6-300x295.png\" alt=\"Figure 6. IP\/LP Rotor Assembly Installed at the Power Plant, Rapid Steam Turbine Replacement\" width=\"300\" height=\"295\" srcset=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6-300x295.png 300w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6-163x160.png 163w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6-90x90.png 90w, https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6.png 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-68475\" class=\"wp-caption-text\">Figure 6. IP\/LP Rotor Assembly Installed at the Power Plant<\/figcaption><\/figure><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>The RESULT:<\/strong> \u00a0MD&amp;A completed installation 3 weeks earlier than the committed date. The total time from project start to turbine operation was <strong>less than 12 months<\/strong>. In addition to the key elements discussed above, critical to this success was MD&amp;A\u2019s responsive approach combined with extraordinary teamwork. \u00a0The Owner and MD&amp;A approached this project as a team.\u00a0 The Owner\u2019s Plant personnel provided support in a variety of ways from the start of the project through turbine commissioning and startup.<\/p>\n<p>A truly extraordinary accomplishment was achieved in the power industry with this Rapid Steam Turbine Replacement Project, resulting in a critical electrical generating unit returned to service for the Owner and their customers in less than half of the normal time.<\/p>\n<p>In our 35 years, MD&amp;A\u2019s commitment to excellence has earned customer trust for all turbine-generator needs. We focus on delivering consistent quality and value with fast response, superior communications, and innovative solutions.<\/p>\n<p>MD&amp;A is easy to work with. We provide immediate access to expert help when you need it, where you need it. Around the corner or the globe, we ensure prompt, thorough communication and follow-through. For every repair job, large or small, the speed and effectiveness of our response team are matched only by the depth and breadth of our engineering expertise.<\/p>\n<p>Find out today why so many power generators use MD&amp;A to maximize operational effectiveness. Call us today +1 (518) 399-3616 or <a href=\"https:\/\/www.mdaturbines.com\/contact\/\">Contact us<\/a>.<\/p>\n<p><iframe loading=\"lazy\" src=\"https:\/\/www.youtube.com\/embed\/ainzwG4whLA?rel=0&amp;showinfo=0\" width=\"640\" height=\"360\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><span data-mce-type=\"bookmark\" style=\"display: inline-block; width: 0px; overflow: hidden; line-height: 0;\" class=\"mce_SELRES_start\">\ufeff<\/span><span data-mce-type=\"bookmark\" style=\"display: inline-block; width: 0px; overflow: hidden; line-height: 0;\" class=\"mce_SELRES_start\">\ufeff<\/span><span data-mce-type=\"bookmark\" style=\"display: inline-block; width: 0px; overflow: hidden; line-height: 0;\" class=\"mce_SELRES_start\">\ufeff<\/span><span data-mce-type=\"bookmark\" style=\"display: inline-block; width: 0px; overflow: hidden; line-height: 0;\" class=\"mce_SELRES_start\">\ufeff<\/span><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mechanical Dynamics &amp; Analysis (MD&amp;A) completed a comprehensive and rapid steam turbine replacement\u00a0project in record time after the unit experienced a catastrophic failure event, requiring&#8230;<\/p>\n","protected":false},"author":13,"featured_media":68475,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[211,209],"tags":[77,247,264],"class_list":["post-68469","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-parts","category-steam-turbine","tag-steam-turbine","tag-steam-turbine-repair","tag-steam-turbine-replacement"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rapid Steam Turbine Replacement &#8211; MD&amp;A Turbines<\/title>\n<meta name=\"description\" content=\"MD&amp;A completed a comprehensive &amp; rapid steam turbine replacement\u00a0project in record time after the unit experienced a catastrophic failure event.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rapid Steam Turbine Replacement &#8211; MD&amp;A Turbines\" \/>\n<meta property=\"og:description\" content=\"MD&amp;A completed a comprehensive &amp; rapid steam turbine replacement\u00a0project in record time after the unit experienced a catastrophic failure event.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/\" \/>\n<meta property=\"og:site_name\" content=\"MDA Turbines\" \/>\n<meta property=\"article:publisher\" content=\"http:\/\/www.facebook.com\/mdaturbines\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-07T15:07:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-12T16:25:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6.png\" \/>\n\t<meta property=\"og:image:width\" content=\"480\" \/>\n\t<meta property=\"og:image:height\" content=\"472\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Caitlin Borger\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Caitlin Borger\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/\"},\"author\":{\"name\":\"Caitlin Borger\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/person\\\/fdbd01ed3b81195a72d31a7c9d59d29e\"},\"headline\":\"Rapid Steam Turbine Replacement\",\"datePublished\":\"2021-05-07T15:07:57+00:00\",\"dateModified\":\"2022-05-12T16:25:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/\"},\"wordCount\":938,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/6.png\",\"keywords\":[\"steam turbine\",\"steam turbine repair\",\"Steam Turbine Replacement\"],\"articleSection\":[\"Parts\",\"Steam Turbine\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/\",\"name\":\"Rapid Steam Turbine Replacement &#8211; MD&A Turbines\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/6.png\",\"datePublished\":\"2021-05-07T15:07:57+00:00\",\"dateModified\":\"2022-05-12T16:25:38+00:00\",\"description\":\"MD&A completed a comprehensive & rapid steam turbine replacement\u00a0project in record time after the unit experienced a catastrophic failure event.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/6.png\",\"contentUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2021\\\/05\\\/6.png\",\"width\":480,\"height\":472,\"caption\":\"Figure 6. IP\\\/LP Rotor Assembly Installed at the Power Plant\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/rapid-steam-turbine-replacement\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mdaturbines.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rapid Steam Turbine Replacement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#website\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/\",\"name\":\"MD&A Turbines\",\"description\":\"MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US..\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\"},\"alternateName\":\"Mechanical Dynamics & Analysis\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mdaturbines.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#organization\",\"name\":\"Mechanical Dynamics & Analysis\",\"alternateName\":\"MD&A Turbines\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/MDA_logo.gif\",\"contentUrl\":\"https:\\\/\\\/www.mdaturbines.com\\\/wp-content\\\/uploads\\\/2019\\\/01\\\/MDA_logo.gif\",\"width\":1179,\"height\":258,\"caption\":\"Mechanical Dynamics & Analysis\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"http:\\\/\\\/www.facebook.com\\\/mdaturbines\",\"https:\\\/\\\/x.com\\\/mdaturbines\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mdaturbines.com\\\/#\\\/schema\\\/person\\\/fdbd01ed3b81195a72d31a7c9d59d29e\",\"name\":\"Caitlin Borger\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g\",\"caption\":\"Caitlin Borger\"},\"url\":\"https:\\\/\\\/www.mdaturbines.com\\\/resources\\\/author\\\/caitlin-borger\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rapid Steam Turbine Replacement &#8211; MD&A Turbines","description":"MD&A completed a comprehensive & rapid steam turbine replacement\u00a0project in record time after the unit experienced a catastrophic failure event.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/","og_locale":"en_US","og_type":"article","og_title":"Rapid Steam Turbine Replacement &#8211; MD&A Turbines","og_description":"MD&A completed a comprehensive & rapid steam turbine replacement\u00a0project in record time after the unit experienced a catastrophic failure event.","og_url":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/","og_site_name":"MDA Turbines","article_publisher":"http:\/\/www.facebook.com\/mdaturbines","article_published_time":"2021-05-07T15:07:57+00:00","article_modified_time":"2022-05-12T16:25:38+00:00","og_image":[{"width":480,"height":472,"url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6.png","type":"image\/png"}],"author":"Caitlin Borger","twitter_misc":{"Written by":"Caitlin Borger","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/#article","isPartOf":{"@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/"},"author":{"name":"Caitlin Borger","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/person\/fdbd01ed3b81195a72d31a7c9d59d29e"},"headline":"Rapid Steam Turbine Replacement","datePublished":"2021-05-07T15:07:57+00:00","dateModified":"2022-05-12T16:25:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/"},"wordCount":938,"commentCount":0,"publisher":{"@id":"https:\/\/www.mdaturbines.com\/#organization"},"image":{"@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6.png","keywords":["steam turbine","steam turbine repair","Steam Turbine Replacement"],"articleSection":["Parts","Steam Turbine"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/","url":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/","name":"Rapid Steam Turbine Replacement &#8211; MD&A Turbines","isPartOf":{"@id":"https:\/\/www.mdaturbines.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/#primaryimage"},"image":{"@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6.png","datePublished":"2021-05-07T15:07:57+00:00","dateModified":"2022-05-12T16:25:38+00:00","description":"MD&A completed a comprehensive & rapid steam turbine replacement\u00a0project in record time after the unit experienced a catastrophic failure event.","breadcrumb":{"@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/#primaryimage","url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6.png","contentUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2021\/05\/6.png","width":480,"height":472,"caption":"Figure 6. IP\/LP Rotor Assembly Installed at the Power Plant"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mdaturbines.com\/resources\/rapid-steam-turbine-replacement\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mdaturbines.com\/"},{"@type":"ListItem","position":2,"name":"Rapid Steam Turbine Replacement"}]},{"@type":"WebSite","@id":"https:\/\/www.mdaturbines.com\/#website","url":"https:\/\/www.mdaturbines.com\/","name":"MD&A Turbines","description":"MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US..","publisher":{"@id":"https:\/\/www.mdaturbines.com\/#organization"},"alternateName":"Mechanical Dynamics & Analysis","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mdaturbines.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mdaturbines.com\/#organization","name":"Mechanical Dynamics & Analysis","alternateName":"MD&A Turbines","url":"https:\/\/www.mdaturbines.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2019\/01\/MDA_logo.gif","contentUrl":"https:\/\/www.mdaturbines.com\/wp-content\/uploads\/2019\/01\/MDA_logo.gif","width":1179,"height":258,"caption":"Mechanical Dynamics & Analysis"},"image":{"@id":"https:\/\/www.mdaturbines.com\/#\/schema\/logo\/image\/"},"sameAs":["http:\/\/www.facebook.com\/mdaturbines","https:\/\/x.com\/mdaturbines"]},{"@type":"Person","@id":"https:\/\/www.mdaturbines.com\/#\/schema\/person\/fdbd01ed3b81195a72d31a7c9d59d29e","name":"Caitlin Borger","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/faa1bbe36738add63e725f8191397d3717e8a6996cb3e1307ba69d4d9114030f?s=96&d=mm&r=g","caption":"Caitlin Borger"},"url":"https:\/\/www.mdaturbines.com\/resources\/author\/caitlin-borger\/"}]}},"_links":{"self":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/68469","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/comments?post=68469"}],"version-history":[{"count":5,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/68469\/revisions"}],"predecessor-version":[{"id":70738,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/posts\/68469\/revisions\/70738"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/media\/68475"}],"wp:attachment":[{"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/media?parent=68469"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/categories?post=68469"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mdaturbines.com\/wp-json\/wp\/v2\/tags?post=68469"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}