global Archives – MDA Turbines https://www.mdaturbines.com/resources/tag/global/ MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US.. Thu, 16 Nov 2023 16:57:20 +0000 en-US hourly 1 https://www.mdaturbines.com/wp-content/uploads/2020/08/cropped-siteicon-32x32.png global Archives – MDA Turbines https://www.mdaturbines.com/resources/tag/global/ 32 32 Petro Vietnam’s Rapid Bearing Repair and Journal Machining https://www.mdaturbines.com/resources/rapid-bearing-repair-and-journal-machining/ Tue, 13 Aug 2019 16:25:31 +0000 https://www.mdaturbines.com/?p=65268 At Petro Vietnam Vung Ang 1 Thermal Power Plant, Mechanical Dynamics & Analysis (MD&A) experts repaired damaged babbitt bearings and refurbished journals for a customer...

The post Petro Vietnam’s Rapid Bearing Repair and Journal Machining appeared first on MDA Turbines.

]]>
At Petro Vietnam Vung Ang 1 Thermal Power Plant, Mechanical Dynamics & Analysis (MD&A) experts repaired damaged babbitt bearings and refurbished journals for a customer on a steam turbine-generator with the unit in an assembled (rotor-in) condition.

The unit was forced from service due to turbine bearing failures. In a quick turnaround, journal refurbishment occurred in the field and was completed by MD&A Machining Services, while bearing repair occurred at MD&A Bearings Seals & Hydraulics Division in Euclid, Ohio, USA.

During the outage, bearings 1-8 along with the thrust bearing was removed and visually inspected to determine suitability for continued use. Bearings 3-6, all elliptical-type journal bearings, were found damaged and sent to MD&A (Ohio, USA) for repair. The bearings were refurbished using MD&A’s proven methods and final bore machining was completed after as machined journal dimensions were determined.

In addition to bearing repair, 8 journals were also restored. Journals 3-6 required machining and honing to remove minor radial grooving utilizing a stationary journal machine. Journals 1, 2, 7, and 8 only required polishing, which was also completed using stationary journal equipment. Because only polishing occurred, these journals had minimal stock removed and the customer continued to use the current size bearings as bearing clearances were well within specification. All journals met or exceeded the customer’s acceptance criteria.

Bearing Repair and Journal refurbishment bearing repair

Our team worked “in sync” with Petro Vietnam to fulfill all compliance requirements both in the USA and Vietnam to avoid any delay in transit and customs clearance. With all divisions working together, this team approach ensured the job was completed quickly and efficiently, minimizing the forced outage duration.

All incoming inspection data was provided to the customer daily along with an updated report. Inspection data consisted of axial journal measurements and concentricity checks. The same data was taken during the final inspection along with the addition of surface finish measurements.

Refurbished T3 journal
Refurbished T3 journal

T3 journal surface roughness reading
T3 journal surface roughness reading

Technical directors from MD&A provided oversight throughout reassembly and startup. During bearing reassembly, contact checks and clearance checks were performed.

Additional work completed during reassembly included:

  • Coupling disassembly and alignment checks
  • Alignment corrections by adjusting locations at bearings 1-6
  • Alignment corrections by moving the generator assembly horizontally
  • Disassembly of the thrust bearing to facilitate coupling disassembly
  • Adjusting the position of the HP/IP turbine shell to match bearing moves at bearings 1 & 2
  • Visual inspection and repairs of the thrust bearing pads and runner
  • Final alignment checks and reassembly
  • Oil flush utilizing on-base pumps

Our team quickly restored Petro Vietnam’s 8 journals and repaired 4 elliptical journal bearings, providing exceptional quality of workmanship and superior communication that met their expectations and exceeded the schedule.

MD&A experts are there when you need us! Providing comprehensive inspection and repair of turbine-generator components for many different OEMs across the world.

Our specialized services range from gas or steam turbine-generator inspections and repairs to parts and controls. Call MD&A today at +1 (518) 399-3616 or use our Contact form.

References available on request

The post Petro Vietnam’s Rapid Bearing Repair and Journal Machining appeared first on MDA Turbines.

]]>
Global Multiyear Major Outages https://www.mdaturbines.com/resources/global-multiyear-major-outages/ https://www.mdaturbines.com/resources/global-multiyear-major-outages/#respond Fri, 06 Oct 2017 13:26:17 +0000 https://www.mdaturbines.com/?p=62612 Mechanical Dynamics & Analysis (MD&A) recently performed multiyear outages for a customer on several different units in Colombia. First unit:  This was a major outage...

The post Global Multiyear Major Outages appeared first on MDA Turbines.

]]>
Mechanical Dynamics & Analysis (MD&A) recently performed multiyear outages for a customer on several different units in Colombia.

First unit:  This was a major outage and generator test & inspection. In addition, this unit was retrofitted with a new rotor, bearings, and steam path components that required machining, including installing and fitting new nozzles. MD&A provided Project Management, Technical Direction, a Controls Engineer, and a Vibration Engineer for startup and balancing.

In order to maintain the outage’s schedule, MD&A worked closely with the OEM’s engineering team to ensure that the new retrofitted components were installed correctly and to resolve any technical or engineering issues quickly. MD&A’s knowledge, experience and our skilled project manager and technical adviser resulted in this successful outage.

Major OutageMD&A’s Repairs Division personnel performed onsite final machining of the nozzle plates and their associated shell locations. Our repair technicians also performed on-site diaphragm repairs.

MD&A also provided a packing installation specialist to install and final machine new upgraded packing.

To support the major outage schedule and expedite the on-site work, MD&A sourced equipment locally to overcome the time required to get the specialty tooling and equipment trailers through Colombian customs.

This unit was started up without incident and has been operational since.

Major OutageAnother unit: MD&A provided Project Management and Technical Direction on a Steam Turbine Generator (STG) major inspection and performed Generator testing and inspection. MD&A also provided a balance engineer, Topless Alignment®, and start-up commissioning support through our Turbine and Generator Controls Division.

The steam turbine had not been inspected for 23 years. Using MD&A’s pre-outage planning processes and experience, the execution team immediately started working to identify & mitigate potential project risks. One example was special tooling, which needed to be located and prepared for use.

After the balancing work was performed, the machine was started up smoothly, synchronized, and brought to full load. This unit has been operational without issue since this start up, after 23 years without maintenance.

Major Outage

Another unit: MD&A worked this unit and the one above in parallel to minimize the impacts on schedule caused by the emergent work.  MD&A provided Project Management, Technical Direction, and balance support at start up for this valve, bearing, and turning gear inspection.  MD&A also supported conversion of the Mechanical Hydraulic Controls (MHC) to Electro-Hydraulic Controls (EHC) (with the exception of the mechanical overspeed trip, which was retained).

Major OutageThis unit was started up without incident and has been operational ever since.

Last unit:  This major outage was similar to the other unit’s scope including valve, bearings, and turning gear, but was expanded to include generator bearings and coupling alignment. As was the case for all units, a lube oil flush was performed. For this start up, vibration data was analyzed remotely by MD&A, saving the customer the mobilization cost for the vibration specialist.

This unit was also started up without incident and has been operational ever since.

Epilogue: These successful outages demonstrate the full-service capability, responsiveness, and flexibility that MD&A can provide. The customer was very appreciative of our flexibility and our ability to adjust our execution plan as required to support the overall outage plan.

Throughout the U.S. and around the globe, MD&A provides responsive support, thorough communication, and excellent execution, making MD&A the service provider of choice for numerous power generation asset owners who desire a one-stop solution for all of their turbine-generator needs.

Call MD&A today at +1 (518) 399-3616 or use our Contact form.

Also be sure to sign up for our MD&A Insight e-newsletter delivered quarterly.  Fill in sign up form on the left-hand side and hit SUBSCRIBE!

The post Global Multiyear Major Outages appeared first on MDA Turbines.

]]>
https://www.mdaturbines.com/resources/global-multiyear-major-outages/feed/ 0