major inspection Archives – MDA Turbines https://www.mdaturbines.com/resources/tag/major-inspection/ MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US.. Mon, 31 Mar 2025 17:15:33 +0000 en-US hourly 1 https://www.mdaturbines.com/wp-content/uploads/2020/08/cropped-siteicon-32x32.png major inspection Archives – MDA Turbines https://www.mdaturbines.com/resources/tag/major-inspection/ 32 32 Siemens ST-600 Industrial Steam Turbine Major Inspection https://www.mdaturbines.com/resources/siemens-st-600-industrial-steam-turbine-major-inspection/ https://www.mdaturbines.com/resources/siemens-st-600-industrial-steam-turbine-major-inspection/#respond Mon, 31 Mar 2025 17:15:33 +0000 https://www.mdaturbines.com/?p=74955 Mechanical Dynamics &Analysis (MD&A) recently completed a steam turbine major inspection of an industrial Siemens® SST-600, 36-stage, 60.5 MW steam turbine including generator and related...

The post Siemens ST-600 Industrial Steam Turbine Major Inspection appeared first on MDA Turbines.

]]>
Mechanical Dynamics &Analysis (MD&A) recently completed a steam turbine major inspection of an industrial Siemens® SST-600, 36-stage, 60.5 MW steam turbine including generator and related system components.

Industrial steam turbine/generators are used globally in chemical and petrochemical plants, refineries, pulp & paper mills, and mining operations. They are also used in biomass and waste-to-energy facilities, combined heat and power plants, geothermal and concentrated solar power installations, and desalination operations, including many others.

Ongoing operation of these units ensures stable, reliable use of proven technologies to convert the expansive power of steam into useful mechanical work. The processes are both fundamental and critical as the world exploits all available resources to meet its present and future needs for heat and power.

The professionals at MD&A are uniquely qualified to serve these needs by applying their deep and time-tested experience with steam turbine/generators, regardless of OEM.

For this particular industrial unit, onsite work was performed by MD&A’s Outage Services division, Generator division and our Turbine & Generator Controls division. All valves were sent to MD&A’s Turbine-Generator Repair Facility in St. Louis, MO for inspection and repair. MD&A’s Bearing, Seals and Hydraulics Division in Euclid, OH, inspected bearing assemblies, thrust pads and oil deflectors.

ST-660 Industrial Steam Turbine Major Inspection

After mobilizing, MD&A’s experts removed the upper-half shell and turbine rotor, then performed blast cleaning for complete non-destructive examination. The rotor, packing carriers and blade carriers were aligned to OEM specifications. The nozzles were blast cleaned and NDE’d in place.

Inspection revealed evidence of steam cutting that was photographed and recorded, as well as some deformed bolts. Various other specifics were recorded in the Recommendations Report.

Upper half and lower half shells were also cleaned and inspected.

A key benefit of MD&A’s inspections is written and photographic documentation of lessons learned that can assist the owner/operator in future outages. One lesson learned was on the rotor lift. For this inspection, the turnbuckles were removed and chain falls were used in their place. For future outages, two 15-ton and two 10-ton chain falls should be on hand due to minimal lift clearances.

Rotor Lift
Rotor Lift

This recording would benefit both owner/operator and contractors involved in future work.

In-depth inspections then proceeded. This included axial and radial blade clearances, rotor radial runout checks, nut rotation and tightening, thrust bearing clearances, and complete visual and NDE inspections (general, HP impulse wheel, and all 36 rotor stages).

Generator

For the Siemens® conventionally air-cooled generator (71.18 MVA), the coolers were cleaned, visually inspected and pressure tested. The field was removed and generator inspection and testing were performed.

MD&A completed major inspections of both the generator field and stator including visual, borescope and electrical testing. Minor contamination was found on the field turn windings beneath the retaining ring. Signs of field turn migration were also identified and addressed.

One field ground detection bolt was found already removed prior to the MD&A Generator Team’s arrival. It was reinstalled according to OEM specifications. To complete electrical testing, the field winding was isolated from the brushless excitation components. Testing then proceeded on the generator field (IR with PI, DLRO and AC Impedance), rotating armature and rectifier wheel, stationary field, and stator.

At completion, field windings were reconnected to the shaft-mounted brushless excitation equipment and a final IR test was performed.

EL-CID core test in progress
EL-CID core test in progress

Conductive paint was applied to the affected partial discharge areas to reduce sparking effect and increase stator bar life.

With testing complete, MD&A issued a recommendation for power factor testing at yearly outage intervals to monitor health of the insulation system.

Brushless Exciter

The brushless exciter was cleaned, inspected, and realigned. The ABB Unitrol 6000 Exciter Regulator Cabinet was also cleaned and inspected.

Field Winding Connected with Brushless Excitation System
Field Winding Connected with Brushless Excitation System

Steam Turbine Valves

MD&A’s facility in St. Louis disassembled, cleaned and inspected the control valve, main stop valve and other valves. The emergency stop valve was also disassembled, cleaned and inspected during the outage.

For all, a final blue check was performed, 100% blue contact was achieved. New rope packing, supplied by MD&A, was installed during valve reassembly.

Stop Valve Disc Ground and Polished
Stop Valve Disc Ground and Polished

Other Key Elements

All turbine bearings were replaced due to wear. Generator bearings were NDE’d and reused. Replacement thrust bearings were installed at reassembly due to wear, New RTDs were installed at MD&A’s Bearing, Seals and Hydraulics facility.

Auxiliary system work included the lube oil tank which was drained and cleaned under MD&A supervision. MD&A performed additional cleaning of the tank and baffle plates. Two lube oil coolers were unstacked, washed and disassembled.

Alignment

Topless laser alignment was completed before startup. This method utilizes laser accuracy to eliminate the time-consuming and expensive process of reassembling a steam turbine for “Tops-On” alignment measurements, saving hundreds of man-hours labor per turbine section. This included horizontal joint measurements, bolt roundness checks, stationary component position verification, and side slip readings among others using laser equipment. Our alignment engineers have the expert knowledge needed to interpret the data.

Why MD&A?

The experts at MD&A are not only dedicated to the fundamentals of turbine and generator longevity. They apply their vast experience in all OEMs to understand and import precise lessons learned throughout the industry, then direct their knowledge and skills to the ongoing development of using steam effectively and efficiently for the long-term benefit of owner/operators throughout the world.

MD&A’s technical directors and service technicians bring decades of experience to each industrial and utility project regardless of OEM, a process now proven in more than 20 countries worldwide. Committed to both industrial and utility customers.

We invite you to discuss any industrial steam turbine major inspection or other steam turbine, generator or gas turbine issues with us today. Call us at (518) 399-3616 or use our Contact Form.

The post Siemens ST-600 Industrial Steam Turbine Major Inspection appeared first on MDA Turbines.

]]>
https://www.mdaturbines.com/resources/siemens-st-600-industrial-steam-turbine-major-inspection/feed/ 0
Gas Turbine Major and Generator Test & Balance https://www.mdaturbines.com/resources/gas-turbine-major/ Tue, 28 Feb 2017 20:56:00 +0000 https://www.mdaturbines.com/?p=3760 Mechanical Dynamics and Analysis (MD&A) was contracted after a forced outage to perform a major overhaul on a cogeneration unit’s MS5001PA gas turbine, and to...

The post Gas Turbine Major and Generator Test & Balance appeared first on MDA Turbines.

]]>
Mechanical Dynamics and Analysis (MD&A) was contracted after a forced outage to perform a major overhaul on a cogeneration unit’s MS5001PA gas turbine, and to remove, test and inspect the generator field. Because the unit dispatches as baseload and the turbine is a critical asset, MD&A was asked to complete the repair work as quickly as possible. MD&A met the customer’s expedited schedule, enabling the unit to quickly return to service.

Because the nature of the forced outage was not fully known when the job was awarded, the scope of work initially was incomplete. Despite the uncertainties, MD&A’s experienced technical team quickly evaluated the damage and designed a comprehensive scope of work.

Gas Turbine Major

As part of its work, MD&A’s gas turbine maintenance team both opened and closed the gas turbine. In addition, the team removed the original rotor and shipped it off-site for refurbishment and high-speed balance.

As well, MD&A removed the generator field and sent it to our St. Louis facility for a complete test and inspection, and high-speed balance before being returned to site.

The scope of work included:

Site Work Services

  • GT Major Inspection & Rotor Removal
  • Generator Major Inspection and test & inspection – the insulation was repaired, flux probes installed and completely re-painted inside
  • Stage 9 Stator Hook Fit Mod- removal of Upper & Lower Compressor Casings
  • Installed New Electronic Gas Valves – removal of old Hydraulic Gas Valves
  • Remove Existing Liquid Fuel System, and associated support systems, such as Atomizing Air and Water Injection – A Controls Software Upgrade to eliminate these control sections
  • Accessory and Load Gear Refurbishments
  • Exhaust Frame Repairs

Shop Work Repairs

  • Gas Turbine Rotor Inspection
  • Remove and Inspect 1st stage buckets – Apply coating for excessive rock and repair Aft Angel Wings
  • Replace out 2nd stage buckets
  • Compressor Blending
  • Refurbish HGP Components, Combustion Hardware
  • Generator Field Rings Off Inspection, test & inspect, and high-speed balance
  • Gas Turbine rotor high-speed balance

New Parts

  • 2nd Stage Buckets
  • 2nd Stage Shroud Blocks
  • Consumables & Hardware
  • Auxiliaries
  • Exhaust Plenum

Gas Turbine Major

MD&A also performed major repairs on the turbines accessory system, such as refurbishment of Accessory & Load Gears, replacement of turbine compartment vent fans, rebuilding of Exhaust Ducting, replacement of Exhaust Expansion Joints, as well as removal of hydraulic overspeed bolt and replacement with redundant electronic overspeed protection.

MD&A’s specialized services range from Combustion, Hot Gas Path and Major Inspections, as well as, Compressor & Turbine Rotor Repairs to Plant Performance Testing and Analysis. We also provide turbine internal alignment to your gas turbine, along with vibration analysis and balance (low-speed & high-speed.)

Call our Gas Turbine Services at (518) 399-3616 or use our Contact form.

Read the Combined Cycle Journal (CCJ) article.

Gas Turbine Major

 

The post Gas Turbine Major and Generator Test & Balance appeared first on MDA Turbines.

]]>