co-gen turbine Archives – MDA Turbines https://www.mdaturbines.com/resources/tag/co-gen-turbine/ MDA Turbines is one of the largest turbine-generator repair and turbine engineering organizations in the US.. Thu, 16 Nov 2023 16:42:27 +0000 en-US hourly 1 https://www.mdaturbines.com/wp-content/uploads/2020/08/cropped-siteicon-32x32.png co-gen turbine Archives – MDA Turbines https://www.mdaturbines.com/resources/tag/co-gen-turbine/ 32 32 Co-Gen Turbine Controls Retrofit https://www.mdaturbines.com/resources/co-gen-turbine-controls-retrofit/ https://www.mdaturbines.com/resources/co-gen-turbine-controls-retrofit/#respond Mon, 20 Nov 2017 20:05:10 +0000 https://www.mdaturbines.com/?p=62806 Mechanical Dynamics & Analysis’ Turbine and Generator Controls Division replaced an industrial co-gen turbine’s original mechanical-hydraulic (MHC) controls with an electronic governor, electro-hydraulic trip system...

The post Co-Gen Turbine Controls Retrofit appeared first on MDA Turbines.

]]>
Mechanical Dynamics & Analysis’ Turbine and Generator Controls Division replaced an industrial co-gen turbine’s original mechanical-hydraulic (MHC) controls with an electronic governor, electro-hydraulic trip system and self-contained control valve actuator.

The primary drivers for the project were the operator’s desire to increase the long-term maintainability and reliability by replacing the MHC components that had become more problematic as they reached their end of life. Secondary benefits of the retrofit were increased operability through enhanced remote control and on-line testing capabilities as well as the addition of automatic synchronization.

turbine controls retrofit

The MHC governor components in the turbine’s front standard were removed and replaced with a Woodward® Governor 505D electronic governor, mounted in a stand-alone cabinet in the unit’s control room.

The turbine speed feedback to the governor is supplied by a toothed wheel mounted on the end of the generator shaft and electronic speed pick-ups mounted on the generator’s collector assembly. The governor’s load control and speed regulation software combine with set points from the plant DCS to provide a position signal for the control valve actuator governing the steam flow through the turbine.

The low pressure hydraulic control valve actuator in the front standard has been removed and replaced with a REXA® high pressure, rotary electraulic™ actuator coupled directly to the control valve cam shaft. This rotary action and direct coupling eliminates lost motion and mechanical hysteresis inherent in the original system.

The actuator’s positioning electronics receive the desired position signal from the 505D governor and control the position of the rotary actuator. The electronic to hydraulic interface is provided by the REXA® skid mounted control module and accumulator assembly. The assemblies servo-motor, booster pump and motor, accumulator and trip solenoids provide control over the actuators normal motion, fast motion and trip closed functions respectively. The recommended maintenance cycle for the new actuator components is ten years.

The unit’s new electro-hydraulic trip system replaces the mechanical over speed device and trip system components that govern the operation of the unit’s main steam stop valve. The MD&A trip manifold, which is mounted on the unit’s front standard, has a two-out-of-three, de-energize to trip solenoid valve configuration which allows the manifold components to be fully testable with the turbine in operation.

Trip and reset of the solenoid valves is governed by signals from a Woodward® ProTech TPS electronic protections system which is mounted in the control cabinet with the 505D governor. The TPS has speed pick-up, pressure switch and relay inputs to provide a single source for all of the turbine’s protective functions including over speed, operational trips and generator protection trips.

turbine controls retrofit

The customer was satisfied and appreciative of this successful installation. The original installation plan was able to be modified “on the fly” to facilitate easier access to turbine hardware during maintenance outages and utilize the customer’s preferred pressure and temperature transmitter hardware.

MD&A’s Turbine and Generator Controls Division maintains a staff of OEM experienced field engineers who provide installation, technical support, advanced troubleshooting, training, and consulting services for gas and steam turbine controls, generator excitation, and auxiliary systems.

Call our MD&A Turbine and Generator Controls Division today at +1 (970) 224-2223 or use our Contact form.

 

The post Co-Gen Turbine Controls Retrofit appeared first on MDA Turbines.

]]>
https://www.mdaturbines.com/resources/co-gen-turbine-controls-retrofit/feed/ 0
Gas Turbine Major and Generator Test & Balance https://www.mdaturbines.com/resources/gas-turbine-major/ Tue, 28 Feb 2017 20:56:00 +0000 https://www.mdaturbines.com/?p=3760 Mechanical Dynamics and Analysis (MD&A) was contracted after a forced outage to perform a major overhaul on a cogeneration unit’s MS5001PA gas turbine, and to...

The post Gas Turbine Major and Generator Test & Balance appeared first on MDA Turbines.

]]>
Mechanical Dynamics and Analysis (MD&A) was contracted after a forced outage to perform a major overhaul on a cogeneration unit’s MS5001PA gas turbine, and to remove, test and inspect the generator field. Because the unit dispatches as baseload and the turbine is a critical asset, MD&A was asked to complete the repair work as quickly as possible. MD&A met the customer’s expedited schedule, enabling the unit to quickly return to service.

Because the nature of the forced outage was not fully known when the job was awarded, the scope of work initially was incomplete. Despite the uncertainties, MD&A’s experienced technical team quickly evaluated the damage and designed a comprehensive scope of work.

Gas Turbine Major

As part of its work, MD&A’s gas turbine maintenance team both opened and closed the gas turbine. In addition, the team removed the original rotor and shipped it off-site for refurbishment and high-speed balance.

As well, MD&A removed the generator field and sent it to our St. Louis facility for a complete test and inspection, and high-speed balance before being returned to site.

The scope of work included:

Site Work Services

  • GT Major Inspection & Rotor Removal
  • Generator Major Inspection and test & inspection – the insulation was repaired, flux probes installed and completely re-painted inside
  • Stage 9 Stator Hook Fit Mod- removal of Upper & Lower Compressor Casings
  • Installed New Electronic Gas Valves – removal of old Hydraulic Gas Valves
  • Remove Existing Liquid Fuel System, and associated support systems, such as Atomizing Air and Water Injection – A Controls Software Upgrade to eliminate these control sections
  • Accessory and Load Gear Refurbishments
  • Exhaust Frame Repairs

Shop Work Repairs

  • Gas Turbine Rotor Inspection
  • Remove and Inspect 1st stage buckets – Apply coating for excessive rock and repair Aft Angel Wings
  • Replace out 2nd stage buckets
  • Compressor Blending
  • Refurbish HGP Components, Combustion Hardware
  • Generator Field Rings Off Inspection, test & inspect, and high-speed balance
  • Gas Turbine rotor high-speed balance

New Parts

  • 2nd Stage Buckets
  • 2nd Stage Shroud Blocks
  • Consumables & Hardware
  • Auxiliaries
  • Exhaust Plenum

Gas Turbine Major

MD&A also performed major repairs on the turbines accessory system, such as refurbishment of Accessory & Load Gears, replacement of turbine compartment vent fans, rebuilding of Exhaust Ducting, replacement of Exhaust Expansion Joints, as well as removal of hydraulic overspeed bolt and replacement with redundant electronic overspeed protection.

MD&A’s specialized services range from Combustion, Hot Gas Path and Major Inspections, as well as, Compressor & Turbine Rotor Repairs to Plant Performance Testing and Analysis. We also provide turbine internal alignment to your gas turbine, along with vibration analysis and balance (low-speed & high-speed.)

Call our Gas Turbine Services at (518) 399-3616 or use our Contact form.

Read the Combined Cycle Journal (CCJ) article.

Gas Turbine Major

 

The post Gas Turbine Major and Generator Test & Balance appeared first on MDA Turbines.

]]>